This high-speed line starts from the southeast Shenhai Expressway of Lyjiabu Village, Songshan Street, Qixia City, passing through Qixia City, Zhaoyuan City, Laizhou City, and reaches the end point of Rongwu high-speed Liangguo junction, all in Shenzhen City.

Park buses, etc., good times are free, no money allowance can not do what to do, drought drought death waterlogging death, who do not want to pay from my pocket to others to spend. According to the preliminary planning, the project construction period is 36 months.

Qixia to Laizhou Expressway has been included in the “14th Five-Year Plan” comprehensive Transportation Growth Plan of Shandong Province, and is also a key project of Shenzhen. Some are photogenic, some are not. As long as you don’t starve to death things are good

. The construction of this highway will connect Qixia, Zhaoyuan and Laizhou as a major means of transportation, driving the rapid growth of the economy along the line, and also forming a convenient and fast channel between the main urban area of Shenzhen and Qixia, Zhaoyuan and Laizhou, which is of great significance for strengthening the radiation-driven infiltration of the main urban area of Shenzhen. In addition, Sujiadian interchange connection, Datan interchange connection line, Zhaoyuan West interchange connection line. The publicity shows that the total length of the line is 69.4 kilometers, using two-way six-lane highway standards, the design speed is 120km/h, the width of the roadbed is 34.5 meters, and the estimated investment is 11.57 billion yuan. After the completion of the renovation and expansion of Rongwu high-speed, it will further advance the ability to do things and traffic efficiency, and strengthen the contact of Shenzhen tools to the region. And a gold hook nose.
From September 2 to 4, the Shandong Provincial Department of Transport organized an examination meeting on the preliminary design (including road evaluation) of the Qixia-Laizhou Expressway in Shenzhen. Not beautiful with Dai Lu can not be happier than I love a reporter, the fact  the end to see, of course, can not touch a few photos and can masturbate a night small, big masturbate, strong masturbate ah this beautiful man, look at the side than the face to see elegant. If the city’s fiscal revenue is being reduced, there are still so many broken bills or even more than before, last month, I heard a big uncle in the Northeast said that his land, two or three months did not pay pensions, financial no money, how can I feel contaminated with money, the high altitude in the yard of our community is repaired by the street office, of course, my sense of contaminated can not reach the degree of repair, I also always feel that it should be the property of the community, or we these residents pay the same money. In 2022, Shenzhen issued the “Shenzhen New Urbanization Plan (2021-2035)”, which not only has the overall structure of the high-speed railway network, but also mentions the creation of the high-speed network: By 2025, the “four horizontal and four vertical” expressway network (Rongwu Expressway, Qilai Expressway, Rongwei Expressway, Weiqing Expressway and Yanhai Expressway, Shenhai Expressway, Pengqi Expressway and Longqing Expressway) will be formed, and the expressway mileage will reach 733 kilometers. It is of great significance to improve the structure of Shandong’s highway network, build a comprehensive transportation system, promote regional economic and social growth, and elucidate the overall benefit of the highway network.

At the same time, the proposed Muping-Qixia expressway is adjacent to make up for the shortage of the tool to transport channel between Rongwu Expressway and Rongwei Expressway, which is also of great significance for enhancing the integrated growth of Jiaodong economic circle. At that time, Shenzhen will also add another tool to the main artery. In October 2022, the investigation and design of the Qixia to Laizhou expressway project and the effectiveness of the two-hospital system consultation were announced, which also marked that the highway was about to enter the stage of quality building. And rich a batch of them Jinan Tai ‘an Qingdao Zibo where the high-speed are two-way 10 lanes

This woman must have been drawn “backwards” and in my opinion this is just the tip of the iceberg. Today, Shenzhen is carrying out the Rongwu high-speed reconstruction and expansion project, Shenzhen Guantou to Penglai juncture, Weihai to Yanhai high-speed section will be refreshed, which is also one of the key projects in Shenzhen this year.

In June 2022, the Shenzhen Municipal government and the Shandong Expressway Construction Jiyin Daji collective signed a stand-alone peace negotiation for the investment of the Qixia to Laizhou Expressway, and officially built Jiyin Qilai Expressway